As a bit of light relief from working on my big route, i am revamping the Timber ridge line which Kiinger built.I'm using jvc Rocky Mountain trees and re-texturing as well as changing some bits that to me never made much sense designwise. i am also adding two boards on either side where sight lines are not very good( its mostly only one board wide ) . I've worked two days on it , but will in future only devote one day a week to the project.
this is a three board section heading towards the 7% grade in them thar hills.
above, the 7% grade. gotta watch some TV with the lady wife, but more to come in about an hour....
this is a three board section heading towards the 7% grade in them thar hills.
above, the 7% grade. gotta watch some TV with the lady wife, but more to come in about an hour....