Hi All,
I am building on a big seaport layout for a while now and it will contain some big humpyards.
I'm a very big fan of running my layouts the prototypical way, so I have the following problem now.
Since it's barely undoable to lead every train to a specific track at my humpyards, is it possible to let the AI choose a free track at the yard?
For example:
I have a 5 track yard with 3 tracks occupied.
A new train is coming in, now is it possible to let the AI automically choose one of two free tracks and come to a halt there.
After this procedure the loco will get uncoupled and let the wagons to be picked up later by another loco.
Thank you very much your answers/solutions.
Greetz
Remco
I am building on a big seaport layout for a while now and it will contain some big humpyards.
I'm a very big fan of running my layouts the prototypical way, so I have the following problem now.
Since it's barely undoable to lead every train to a specific track at my humpyards, is it possible to let the AI choose a free track at the yard?
For example:
I have a 5 track yard with 3 tracks occupied.
A new train is coming in, now is it possible to let the AI automically choose one of two free tracks and come to a halt there.
After this procedure the loco will get uncoupled and let the wagons to be picked up later by another loco.
Thank you very much your answers/solutions.
Greetz
Remco