Ranger_51
Ranger_51's Signal Kit | Signal Assets
by
, September 24th, 2020 at 09:26 PM (160 Views)
Signal Assets
Signals in the R51-SK follow a common naming convention: <region> <type> | <upperHead><lowerHead> <function> <routes> <attachment 1> ... | <placement>
Region Type Head Function Routes Attachment Placement NSW
New South WalesDL
Double Light1a
1-aspectH
Home2r
2 routesTi
Turnout IndicatorLH
Left handDL-T
Double Light (Tunnel)2a
2-aspectA
Automatic4r
4 routesMi
Mainline IndicatorRH
Right handSL
Single Light3a
3-aspectAC
Automatic and Controlled6r
6 routesLs
Low Speed Indicator (stand-alone or part of a 4a head)Gr
GroundIND
Indicator4a
4-aspectD
Distant7r
7 routesSh
Subsidiary Shunt IndicatorG
Gantry*
Denotes tri-colour lampsR
RepeaterLD
Single left diverge onlyTu
Turnout UnitW
WallRD
Single right diverge onlyP
Post
Signals can also be searched for by using keywords like “shunt” or “home”. It is also possible to search for signals using the “#asp” convention, where “#” is the combined number of primary aspects (e.g. a 2a3a signal could also be called 5asp).
NSW to Trainz Signal States
NSW State Trainz State Stop Stop Low Speed Stop then Continue Caution Caution Caution Turnout Left Caution Diverge Left 1/2/3 Caution Turnout Right Caution Diverge Right 1/2/3 Medium Advanced Caution Medium Turnout Left Advanced Caution Diverge Left 1/2/3 Medium Turnout Right Advanced Caution Diverge Right 1/2/3 Preliminary Medium Only accessible when using an Advanced Warning Target Clear Proceed Clear Turnout Left Proceed Diverge Left 1/2/3 Clear Turnout Right Proceed Diverge Right 1/2/3 Shunt Medium (Proceed at Medium Speed) Shunt Ahead Slow (Proceed at Slow Speed)