Hello, I am wondering if it is possible to set up a multiple industry track to slowly load a car, rather than all at once.
Let me explain what I want to do. I have a gravel pit that loads the cars via front end loader. I want to run sessions where the local, which is owned by the gravel company, will pull a string of hoppers to the gravel pit, position them over the industry track, and uncouple from them. It will then return to the nearby yard and perform switching duties while the cars become loaded with aggragate. After its switching duties are complete, the local will then return to the gravel pit and pick up the now loaded hoppers.
Is it possible to do this? If yes, what do I have to set the multi industry to get this to work.
Thanks in advance.
jadebullet.
Let me explain what I want to do. I have a gravel pit that loads the cars via front end loader. I want to run sessions where the local, which is owned by the gravel company, will pull a string of hoppers to the gravel pit, position them over the industry track, and uncouple from them. It will then return to the nearby yard and perform switching duties while the cars become loaded with aggragate. After its switching duties are complete, the local will then return to the gravel pit and pick up the now loaded hoppers.
Is it possible to do this? If yes, what do I have to set the multi industry to get this to work.
Thanks in advance.