Utah Belt Railroad Route In Progress

WoW ! Three things I would never even think of saying: When can I have it, I want it sooner, Give me it
HAIIIII
WHEN CAN I HAZ IT
PLZ LET ME DL UR ROUTE
THX

I WANT IT SOONER
GIVE ME IT
THX GUY

I can wait, patiently ... the route looks great
 
Last edited:
It's actually looking quite nice I have to say, keep up the good work. It takes awhile but just looking at what people have done before and are doing, it's well worth it.

Just some tips for pics and releasing:
-You may want to try posting pics directly into the post, or using the thumbnail link (I'd try the latter because this thread has no large pic warning). Imageshack has these all made for you, just copy and paste into the type box.
-It may be easier for you (and your inbox) if you post it on the DLS, on someone else's site (with permission), or if you try creating your own website. Putting the effort into HTML coding and/or Dreamweaver (you can get a 30 day trial from Adobe.com) can look best if you do well, but Google Sites, Freewebs, and other online, WYSIWYG template hosts are pretty easy and look fine.

Good luck!
 
i have a agreement with z-trainz
that is why i advratise them cause i will eventaully get my route on there
trust me
the site is quality
 
-small update-

i am going to compose a freeware session
ill be taking pics too so you will enjoy some updates in about 20-30 mins at the most
 
i would not be suprised if he was on his/her phone
also
i want to give a joke real fast before i post pics
the tourist line's main cash bringer is selling lumber to the local mills.
However the line runs right through a natitional forrest
is it me or did i accidentally make a funny ironic line?
 
i would not be suprised if he was on his/her phone
also
i want to give a joke real fast before i post pics
the tourist line's main cash bringer is selling lumber to the local mills.
However the line runs right through a natitional forrest
is it me or did i accidentally make a funny ironic line?

I'd actually say you made two. :hehe:
 
-more updates-

ok
here are some more updates
these 2 rs11s are the locos for the freeware (freight) session
ok
here are the pics with narration

edit_preview.php

the two locos have got up to speed and are now headed north to the lumber factories about 12 miles out of the natitional forrest in clear creek
the line to clear creek is about 35 miles long but they produce alot of lumber so it pays well

edit_preview.php

here we see the two rs11s crossing miller flat road
the passenger line meets up with a small un-named creek roughly 2.5 miles north of this crossing

edit_preview.php

here we see the s-like curve that will soon be suronded by shrubs and flowers

edit_preview.php

and here we see miller flat road crossing the main exactly before the interchange
a quick note]
the line plans on building a wye there so there is a speed restriction of 15 mph and there is ties everywere
(or itleast i am going to add those now:hehe:)
 
-Yet Another Update

i have expanded to the next town(settlement) on the tourist line
the name according to the map is Miller Flats in game it is Miller's Flats
i am just beggining to construct the place so ill have pics today or early tomarrow
so i hope all will enjoy the next pics
-Taylor
:wave:
 
sorry

i half to go to bed
i have the pics taken so ill post them in the morning
sleep well everyone and god bless

-Taylor
:wave::wave::wave:
 
ok
i set up a session just for this
it no longer exsists
i am now going to work for a little
get blood drawn
then eat
then get back to work

so here are the pics
edit_preview.php

edit_preview.php

edit_preview.php

edit_preview.php

edit_preview.php

edit_preview.php

edit_preview.php


well that is all i have for now
i need to find some detaild laying ties i can lay for the wye

anyways
the depots are interactive
(accept for the ones on the UB mainline)
please havea good day everyone
 
hey man
give me some credit
that is only 4 days of work
lets see you do all that in 4 days and add textures and flora
and anyways
i am testing it now to see what to add

Hey pal, you're asking for comments about it, don't get defensive. Your route needs work.
 
Textures, trees and buildings can be added dead last, months from now, or even by the end user ... terrain, trackwork and gradients come first.

Need help? PM me.

I will never texture my route (as I am constantly adjusting the yellow grid lines up and down) untill it's track is completely finished.

I gave my Horseshoe route to one person, and he is having a blast with it, testing it ... and it has no textures, trees, and only a choice few buildings.
 
Last edited:
Textures, trees and buildings can be added dead last, months from now, or even by the end user ... terrain, trackwork and gradients come first.

Need help? PM me.

I will never texture my route (as I am constantly adjusting the yellow grid lines up and down) untill it's track is completely finished.

I gave my Horseshoe route to one person, and he is having a blast with it, testing it ... and it has no textures, trees, and only a choice few buildings.


THAT IS EXACTLY WHAT IM DOING!
finaly someone who thinks like me
 
Back
Top