So, at this point I have to ask this: It makes sense that all the commands, schedules, etc. are exclusive of sessions. But if you set your points to be all synchronized with the multiple junction controllers, they are also exclusive to sessions. I feel that these should be made to be part of the route. If you make a "new session", you have to re-do every single one. I have over 500 hundred points most in complex settings. The last time I had to re-install the program, I had to start all over again. Even doing the copy and paste of the local folder it took me over a week to set everything again, as many of the script of points settings was not operational. Probably if they would have been part of a route, they would have survived the copy and paste process better. This is an old topic, but with all the "new" versions of our simulator, you would think NV3 would have looked in to it, yes?