Hi again,
I seem to be making hard work of jointing track and crossings.
Still working on the ECML using 2010ee Surveyor.
I am picking 'auran track ts2009 oak' but the Move Track button will not select and hold it.
It is a 'dual carriageway' but I am connecting individualy.
No doubt using the wrong method, could you point me in the right direction?
Rog
I seem to be making hard work of jointing track and crossings.
Still working on the ECML using 2010ee Surveyor.
I am picking 'auran track ts2009 oak' but the Move Track button will not select and hold it.
It is a 'dual carriageway' but I am connecting individualy.
No doubt using the wrong method, could you point me in the right direction?
Rog