Im sure somewhere on the history theres a thread for this but i thought id ask as im sure some one can help
Im curently building a route bassed on the west of england line between Exeter and Salisbury. The route is mostlty single track with passing loops, trouble is some of the loops can be over 50 miles apart and im having problems with the signals one loop will show "line ends or is closed"
is there anything i can do to to get the signals to comunicate with each other without disrupting trafic control??
PS is there a thread on using triggers to control signals??
Im curently building a route bassed on the west of england line between Exeter and Salisbury. The route is mostlty single track with passing loops, trouble is some of the loops can be over 50 miles apart and im having problems with the signals one loop will show "line ends or is closed"
is there anything i can do to to get the signals to comunicate with each other without disrupting trafic control??
PS is there a thread on using triggers to control signals??