ronmargts1
Ronts
I am using TS2009 and am trying to place Lift Bridge 1 in my layout.
Having placed the bridge I then connect the rail to the end point of the bridge and the rail extends right across the gap inthe bridge so that I have a permanent rail extending across the gap.I Have used other layouts where this is not the case. How can I set the bridge without getting a permanent rail across the gap.
Regards
Ron
Having placed the bridge I then connect the rail to the end point of the bridge and the rail extends right across the gap inthe bridge so that I have a permanent rail extending across the gap.I Have used other layouts where this is not the case. How can I set the bridge without getting a permanent rail across the gap.
Regards
Ron