Firemanflyn
Active member
Problem; Session - Train hauling logs to Lumber Mill Kuid # -3:10027
Logs Auran - Log cars ATSF 50' kuid # 62941:16309:4
Train enters Mill drop off quadrant - stalls at beginning of designated
Mill log drop-off area - resumes at speeds of between 1 & 3km.
Moves on to 'drive to track mark (A)' approx 40m from Mill log drop-off.
Still at slow speeds (although increased) moves onto next track mark, and completes remaining commands to storage area.
The inclusion of an 'unload ' command preceding track mark (A) resulted
in one car load of 10 logs being unloaded onto the Mill skids but no
other unloads take place.
Various combination's of track-marks both to and via, and a 'drive to Mill command ' then an unload have all failed. The Mill consume settings have been set at the default of 1-28 and presently @1-0 .
Any help, advise, or suggestions to get logs flowing would be welcome.
rossstringer
Logs Auran - Log cars ATSF 50' kuid # 62941:16309:4
Train enters Mill drop off quadrant - stalls at beginning of designated
Mill log drop-off area - resumes at speeds of between 1 & 3km.
Moves on to 'drive to track mark (A)' approx 40m from Mill log drop-off.
Still at slow speeds (although increased) moves onto next track mark, and completes remaining commands to storage area.
The inclusion of an 'unload ' command preceding track mark (A) resulted
in one car load of 10 logs being unloaded onto the Mill skids but no
other unloads take place.
Various combination's of track-marks both to and via, and a 'drive to Mill command ' then an unload have all failed. The Mill consume settings have been set at the default of 1-28 and presently @1-0 .
Any help, advise, or suggestions to get logs flowing would be welcome.
rossstringer