Eaglefan9727
Member
Hi All,
 
Today marks my 2 weeks with Trainz and I was fooling with route building and I just did a very simple stretch with mountains on one side of the track and water on one side of the tracks, But the water is like this in the following picture.
 
		
		
	
	
		
	
 
What do I need to do in order for the water to be where it is suppose to be at? Th
 
I also have another issue. It is about doing tracks near mountains. Im not trying to do a grade here in the picture below, But as you can tell. It looks like it is doing a grade. How can I get the track to go on a level basis instead of a grade?
 
		
	
Thanks in advance
				
			Today marks my 2 weeks with Trainz and I was fooling with route building and I just did a very simple stretch with mountains on one side of the track and water on one side of the tracks, But the water is like this in the following picture.
	What do I need to do in order for the water to be where it is suppose to be at? Th
I also have another issue. It is about doing tracks near mountains. Im not trying to do a grade here in the picture below, But as you can tell. It looks like it is doing a grade. How can I get the track to go on a level basis instead of a grade?
	Thanks in advance
			
				Last edited: