Route Pathing through junctions

Dan_Hat

New member
Im wandering if any one can help me out, i need to get a junction with multiple switches to work automaticly.

so here is the junctiuon

A--->----J1----- ->---
\
B--<--------J2--J3---<---
\
\
C

so a train is coming form A going to C when J1 switches to right i want J2 and J3 to switch atuomaticly to allow the train to pass then once done for the switches to return to normal

anyone able to help?
 
You could problely use Trigger Check & Check Junction rules for setting up your junctions.
On my route on my main line all junctions are set to the right. On passing siding the point at the other end will be to the left of facing train with a trigger before that switch it will change the points for the train to pass and change back after the train passes.These rules will work with many points.
 
Back
Top