After much research, false starts and fooling around, I got the Ridgway to Peake (Dallas Divide) section of the DEM completed and layed the track. I thought I'd show ya'll what I got so far. Please let me know what you think, I'll take any help you folks are willing to give, and I'll need it..lol.
Thanks
Bernie H
The Ridgway engine shop and yard with the unfinished town of Ridgway in the background.
A three engine freight backs through the yard to the wye
After turning on the D&RGW Ouray Branch wye the freight is ready to start the 4% climb to Peake
Passing over the Pleasant Valley Trestle
Arriving at Peake where the helpers will cut off
Thanks
Bernie H
The Ridgway engine shop and yard with the unfinished town of Ridgway in the background.
A three engine freight backs through the yard to the wye
After turning on the D&RGW Ouray Branch wye the freight is ready to start the 4% climb to Peake
Passing over the Pleasant Valley Trestle
Arriving at Peake where the helpers will cut off