MTH_ELECTRIC_TRAINS
7 Year Trainz Vet
Overhauling Northbay County in TS12
I will not be uploading this to the DLS. This is for my personal use ONLY. Sorry to anyone that would have wanted this modified route.
Screenshots exceed 800x600 in this topic.
So far I have replaced all the track with Pencil42s 3NG 56lb track, added a new roundhouse from Pencil42, added the Multi-Log Decks back in along with the Decker NG3 industries. I will also be adding a new woodchip producing industry at the Northbay Sawmill. This will be separate from the mill and will basically be 1 or 2 multiple industry news with the inputs being 16ft, 32ft, 40ft, and Auran's logs and the output being woodchips for the Rockport Pulp Mill. I will also go and find some Speed Trees and replace the old paper thin ones with better looking Speed Trees. Some trees on the route have been updated or changed and look great while others look terrible. I think I will also go and change out some of the buildings on the route with Pencil42's great old west buildings. If you are wondering, the station is gone and I will replace it will trainboi1's and Andrew's SP Common Standard Type 22 Depot. I will also add other station in Richwood.
The track work will take a long time to do, at least in my opinion anyway because there is so much floating track all over the place. If you don't know already, the different types of old 3ft gauge track have from 0-20 meter enbankments on them. This made it extremely easy for the people who made the route to lay track. The new track does not have enbankments and because of this I am putting Pencil42's spline enbankments under the track to make it look normal. However, I will have to raise the terrain under these embankments if they do not touch the ground in certain areas because the are only 4 meter embankments. I am using Pencil42's tan enbankments and they look good against the dark grey ballast on the 56lb track.
The 2ft gauge line will also get a new Northbound line going to portals.
I will not be uploading this to the DLS. This is for my personal use ONLY. Sorry to anyone that would have wanted this modified route.
Screenshots exceed 800x600 in this topic.
So far I have replaced all the track with Pencil42s 3NG 56lb track, added a new roundhouse from Pencil42, added the Multi-Log Decks back in along with the Decker NG3 industries. I will also be adding a new woodchip producing industry at the Northbay Sawmill. This will be separate from the mill and will basically be 1 or 2 multiple industry news with the inputs being 16ft, 32ft, 40ft, and Auran's logs and the output being woodchips for the Rockport Pulp Mill. I will also go and find some Speed Trees and replace the old paper thin ones with better looking Speed Trees. Some trees on the route have been updated or changed and look great while others look terrible. I think I will also go and change out some of the buildings on the route with Pencil42's great old west buildings. If you are wondering, the station is gone and I will replace it will trainboi1's and Andrew's SP Common Standard Type 22 Depot. I will also add other station in Richwood.
The track work will take a long time to do, at least in my opinion anyway because there is so much floating track all over the place. If you don't know already, the different types of old 3ft gauge track have from 0-20 meter enbankments on them. This made it extremely easy for the people who made the route to lay track. The new track does not have enbankments and because of this I am putting Pencil42's spline enbankments under the track to make it look normal. However, I will have to raise the terrain under these embankments if they do not touch the ground in certain areas because the are only 4 meter embankments. I am using Pencil42's tan enbankments and they look good against the dark grey ballast on the 56lb track.
The 2ft gauge line will also get a new Northbound line going to portals.
Last edited: