Oh lol, i haven't noticed your post here, because this is only a small pics thread, my main thread was on AMTZ. I had inofficial track maps and very good speed charts, but thanks for offering your help  
 
The northeast corridor project is completely finished now, all 453.3 miles from Washington to Boston via the good old PRR Mainline, the New Haven Line and the wonderful Shore Line East are done. The route is as prototypical as possible, i had real track charts for the complete route 
 





Thanks to everyone for the help,
Sincerely
Felix
				
			 
 The northeast corridor project is completely finished now, all 453.3 miles from Washington to Boston via the good old PRR Mainline, the New Haven Line and the wonderful Shore Line East are done. The route is as prototypical as possible, i had real track charts for the complete route
 
 




Thanks to everyone for the help,
Sincerely
Felix
 
	 
	
 
	 
	 .
.













