Newbie Question - Controlling Switches on Needles Sub?

RepublicDC9

New member
I've been a model railroader for 45 years (since age 5) and an avid flight simmer for 28 years, but am just now getting into Trainz (I have 22' and a ton of content already).

Question on the switches on the Needles Sub route I downloaded from the JR site - many of the switches don't have the red/green arrows to change the switch points, how does one control these (or does one need to somehow add the ability to control in surveyor? I've noticed this on some of the street running switches on the fantastic Southeast Terminal railroad as well.

Thanks!

Steve
 
I've been a model railroader for 45 years (since age 5) and an avid flight simmer for 28 years, but am just now getting into Trainz (I have 22' and a ton of content already).

Question on the switches on the Needles Sub route I downloaded from the JR site - many of the switches don't have the red/green arrows to change the switch points, how does one control these (or does one need to somehow add the ability to control in surveyor? I've noticed this on some of the street running switches on the fantastic Southeast Terminal railroad as well.

Thanks!

Steve
Steve,

Did you download both dependency packs?
The automatic US&S M series switch levers are already installed, or at least they were for me and required reverting to original because they are built-in and were opened for editing. To fix this, you need to open Content Manager. Click on the list where it says installed, and change that to open for edit. Anything that's opened there needs to be reverted to original. Highlight the assets, right-click and click on that from the list.

After I did this, I opened the route and nothing was missing.
 
Back
Top