I just wanted to know if anyone was working on a NEC project cuz i would like to help then cuz its one of my favorits so i could help in any way can you post a file or likn of some sort so that i can help.
There are 2 or more DEM's om DLS and Guarc that show where trackage should go, from Allentown/NYC to Phila.
The Neuman-NEC route on DLS is fairly accurate enough, and is a fun route to operate. Although certain places like the Flyover about 5 miles from Wilmington is wrong, and is shown as a ditch, as then prototype does not have a submerged track under the flyover. I replaced all the track on that route with a more detailed track of my choice, and relaid some extra switchs so trains don't take a side track and derail off the end of a branchline near Wilmington. The Phila 30th st station area could use some more trackage, and an interlocking at Zoo would not be too difficult to create on an extended baseboard. http://images.google.com/imgres?img...v=/images?q=zoo+interlocking&gbv=2&hl=en&sa=G