There's an amazing set of images of Patagonian ng Baldwin's here , well worth a look , you don't have to be registered to view the thread. http://ngdiscussion.net/phorum/read.php?1,407890
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Dan, thanks for asking. The goal posts keep moving and my best estimate right now is not anytime soon and probably it will never be finished.The EBT is looking very promising Bob .how many years before you get it complete do you reckon ?
Dan, thanks for asking. The goal posts keep moving and my best estimate right now is not anytime soon and probably it will never be finished.
The above scene in Mt Union (around the "faked in" Timber Transfer crane) lacks several models that are essential to recreating the EBT in Trainz: EBT's coal prep/cleaning plant, Timber Transfer crane, NARCO brick factory (2 other brick factories are located in MT Union and serviced by EBT and/or PRR). All unique structures and use combinations of sg, 3'ng and dg track. No models of them are available.
The PRR tie/creosote plant and yard is one of the goal post movers. I had no good info about it until last Jan. when I brought, "Tracks Around Mt Union" (pub 2018). It includes sg, 2'ng and dg track and used the only 2'ng loco owned by the PRR. All 3 brick factories get pretty good treatment in the book. 1 had its own 3'ng to quarries on both side of the Juniata R. So I'm revising the tracks in the MT Union area to suit some new info while waiting for some industries/models to get created.
Ben Dorsey is another sorely missed individual. He made a lot of the EBT specific content that's currently available. He had a model of the Timber Transfer crane and an EBT enclosed water tank under construction. Neither made it to the DLS and are now lost. I've used 2 of his WP&Y tanks to stand in for the 4 EBT tanks with similar looks for the time being. The 1 I used in Mt Union had to be modified (script, attach pts, tracks and triggers) to handle the dg track that now connects to it and it still needs a new paint job.
It all takes time.
Bob Pearson
I feel sometimes envious then one looks at yours layouts, but i can share some projecet i have in Trainz right now. steam eninge NAEJ no 4 KM NELSSON and the coach NAEJ BCo 3 (Second and thrid class boggie coach no 3)
https://www.mediafire.com/view/f71j6ppyzz6zr7c/3d_BC03.jpg/file Bassed of https://dst15js82dk7j.cloudfront.net/248888/84281839-U5o6m.jpg
https://www.mediafire.com/view/eu691fpht4s8a80/4t.jpg/file and https://www.mediafire.com/view/q3j3vrnrkmjyomh/2t.jpg/file bassed of https://h24-original.s3.amazonaws.com/248888/24938878-IYUNY.jpg