My route under construction

BN1970

Trainz Plus Beta Tester
Here's a shot of my first attempt at a route, doing a little switching in the yard :wave:

trainz2009-10-1622-03-39-39.jpg
 
Looks like you're using MP Wood track...there is also MP Wood Ballast and MP Concrete Rusty Ballast textures on DLS to match those tracks.

Using "MB Quad 4m" mainline as a template, and connecting MP track between it is an easy way to get paralell tracks closer, so that ballast touches ballast.
 
Thanks for the info! I'm still a noob when it comes to route building and all tips are welcomed! :)
 
Back
Top