nouse4aname
New member
Hi Guys
Im really hoping someone out there can help me
Using Traiz 2010 in the merge route option i deleted a layer nothing changed on my route but know when i add a building or move a spline on spefic part of my route it takes like 10 seconds for the building or spline to move.
This is only in the one area of my route if i click anywhere else on the map i dont have this problem is there any way of been able to fix this as i was close to finshing a route i have spent the last 12 months on or em i screwed?
Im really hoping someone out there can help me
Using Traiz 2010 in the merge route option i deleted a layer nothing changed on my route but know when i add a building or move a spline on spefic part of my route it takes like 10 seconds for the building or spline to move.
This is only in the one area of my route if i click anywhere else on the map i dont have this problem is there any way of been able to fix this as i was close to finshing a route i have spent the last 12 months on or em i screwed?