HI!
I found a set of really good looking junctions on a chinese site, they are the type introduced in TRS2006 where you don't have to place any invisible tracks nor any levers, and that is the problem.
Since many scripted signals need the levers for different trainways to show directions etc there's no way to program them. My question is simply if anyone has found a way to get around the problem, or is it possible to link these junctions to a lever in order to fix it?
The signals I'm using are those of Snowsignal (UKRailsim/Railwaves).
Thanks on advance for any answers!
Regards
Johan Viklund
I found a set of really good looking junctions on a chinese site, they are the type introduced in TRS2006 where you don't have to place any invisible tracks nor any levers, and that is the problem.
Since many scripted signals need the levers for different trainways to show directions etc there's no way to program them. My question is simply if anyone has found a way to get around the problem, or is it possible to link these junctions to a lever in order to fix it?
The signals I'm using are those of Snowsignal (UKRailsim/Railwaves).
Thanks on advance for any answers!
Regards
Johan Viklund