gaps at bridges

can anybody tell me how to fill in the gap between a bridge support and an embankment.


What I do is set the bridge much narrower than required, attach road or track spline, and use the spline leveller. Then I move the bridge back to it's proper width.
 
That's a good reply. I have been building a whole rail system and rather than raise the ground to the track at embankments I have used grass embankment splines so the embankments are not too wide and not as in real life. A bit more fiddly effort needed I know but I then can put in spline points and curve them into say where road bridges go under the railway along with some bushes. Looks better for me!
 
Back
Top