"Emit train now" and CPC
"Emit train now" works in TRS2006 but gives a timeout error in TS2010 on my machine.
It is manually operated by a button that appears low down on the right hand side of the screen saying "New Train". When pushed, a window appears with options to select which train to emit.
CPC means "Central Portal Control" and is an alternative way of setting up portals using the properties button. The advantage is that all the portals can be accessed from the same rule even though you can't see them.
"CPC: Emit train" emits a train when your train passes over the specified trigger. It needs "trigger check" or "check trackside" to be used to fire the rule at the right time.
"CPC: Emit train on trigger" has the trigger mechanism built into the rule.
Both of the above rules expect a train to have been set up in CPC.
Since the author of the rules forbids modification it is unlikely that any problems will be fixed.
Trevor