I am not exactly sure, but 21' seems to stick in my mind, for some reason.
The Alleghenny bore in Gallitzin/Tunnelhill (originally single tracked) was crown mined to permit double stack clearance, and I think they lowered the trackbed in the bore also. The Gallitzin bore was closed and sealed off with cinderblocks. The Cassandra RR Overlook Park (old Iron Bridge) was threatened to be removed in the high/wide clearance program, but it was deemed structuraly sound, and spared for now.