Is there a particular way of delivering containers. The train stops at Deliveries. The multiple industries says it will accept 40 foot containers, but it doesn't. What am I doing wrong?
For any multiple industry to work properly, you first need to set it up to accept the goods type
Start by creating a new route, click on Objects and place down a Multiple Industry New. I prefer using this one because "Multiple Industry" and "Multiple Industry Basic" are fixed setups, you can only lower or raise the bar for easy queue you want for those multiple industries
To best explain how to setup, I am using Surveyor Classic
1) Place down a multiple industry new
2) Click on the ? button and click on the multiple industry new
3) Give the Multiple Industry New a meaningful name "Port Botany Container Terminal"
4) Set a Description, I will use Load and Unload 20ft, 40ft and 53ft Containers
5) Click on Queues
6) Note, you will see 6 available queues slots here here you will add
Queue 1: Australian 20ft Hicube Intermodal Containers
Queue 2: Australian 40ft Hicube Intermodal Containers
Queue 3: Australian 53ft Hicube Intermodal Containers
7) Note, where you see Size: 100 change the value to something like 250
8) Where you see Tonnes: 0 click to change this value, I just spam 666666 (6 times) and click ok and it will automatically provide a correct value
note, if you want more change the Size value to 500 or higher and again spam the Tonnes value with 666666 (6 times) for the multiple industry new to give you the correct value
(Hopefully, that makes some sense)?
9) Click Tracks and click on the + button
Select the 20ft, add the 40ft and add the 53ft containers, here you make sure that it each are set to Load and Unload from vehicle
Note: If you are a setting up a coal/grain/ballast as an example choose load into vehicle and for unloaders unload from vehicle
10) Click on Processors, you will see a + -> +, the + is to load onto vehicle the ->+ is to unload from vehicle. You will need to setup these for the 20ft, 40ft and 53ft containers
Click on the First + button and add 20ft, 40ft, and 53ft containers
Leave the default settings for Consume
Click on the Second ->+ button and add 20ft, 40ft, and 53ft containers
Leave the default settings for Produce
11) Where it shows duration change the 30 to at least 5 for faster loading and unloading
12) Click Save Changes
It is up to you how you wish to test out how everything works, just add track and be creative to build a route
You can have the multiple industry new on balloon loops, loop lines, sidings, and end track. Once you have track setup to your desire
add a locomotive, container wagons "Make sure that the container wagons" accept the exact same container wagons your multiple industry new consumes and produces "loads/unloads" if they don't you can easily add them
I hope this information helps! It took me ages to finally figure out how to set it up and this is the best way I can explain it