I'm attempting to build the entire Conway Scenic and even beyond by expanding a Maine Central Mountain Div. route from the defunct Control Point Simulations for my own use. I'm using blank baseboards for the parts of the route I create. At the upper end I'm going to merge a VT-NH Loops route by gfisher for Whitefield and beyond. But for the north end I have to create descending terrain from 566.68 m to about 298 m to merge Whitefield into it. What would be the best way to do that? Here are some screenshots. I'm sorry, but this forum won't let me paste the photos from the links. So, only thing I can do is post the urls and you have to click on them to see the full images. I just tried this site which has a free trial and you have to pay for more space. The links could be temporary. I plan on building south of Bartlett, NH to North Conway and Conway and maybe a bit further south toward Silver Lake where a tourist railroad operated 3 miles of track north of Silver Lake but is now defunct. I don't think I could ever release this unless I got permission from whoever made it at the now defunct Control Point Simulations. I'm using Dave Snow's North Conway Station that I requested him to make and he doesn't want his content used in payware routes. The MEC CPS route was originally payware I believe. I don't know if I would be allowed to release it as freeware even though the original route is no longer available. So for now, it will just be a personal project for myself.
Last edited: