The Next Major project is the CN Holly Sub which Runs from Durand to Millwaukee JCT(Detroit MI). The Line was all ready built in TRS2006 but it was just did not give me a good feeling of the Holly Sub, I feel the 2006 one poorly rep's the CN Holly Sub, So I will make the whole holly Sub and it will be during the Summer. Here is a Screenie: