Doing some work extending one end of the mainline off the board in Schwaninger Land. I'm limited in what asset choices I have because I want to keep it prototypical and stick with the library of assets already being used. The masts were straightforward but the lines and hangers... OMG. There's over 1500 assets all labelled with an obscure code. Which meant getting a whole bunch of pieces out and looking at them until I worked out the code.
I don't know how it works in Surveyor 1 but in Surveyor 2, the only thing on any of the 1500 assets that is grabbable is the attachment point that connects to the track. And no sticky points on the wires! Those damned wires are so thin you've gotta get up close to see them but you've also got to look at the ground so you can see the attachment point. Then you've got to move the wire a bit then zoom around on all three axes to see if you've got the end of the wire anywhere near the hanger. All in all a colossal pain in the arse and a really unpleasant day. And I haven't even finished...
I don't know how it works in Surveyor 1 but in Surveyor 2, the only thing on any of the 1500 assets that is grabbable is the attachment point that connects to the track. And no sticky points on the wires! Those damned wires are so thin you've gotta get up close to see them but you've also got to look at the ground so you can see the attachment point. Then you've got to move the wire a bit then zoom around on all three axes to see if you've got the end of the wire anywhere near the hanger. All in all a colossal pain in the arse and a really unpleasant day. And I haven't even finished...