Hi, On a route I am building(this is a DEM map).Because I can't go (to see with my eyes ) at every places I want to reproduce, I must make some deductions myself and sometimes, I must use only my imagination....even with a DEM map.Here I go: I got an elevation of 600 feet on a 8 miles curve segment of track. So the grade is steep. At some point I come to a bridge (over a stream or river). My question is: Would they have build a ''track'' bridge with the continuation of the 2.5% grade in real life ? (I mean would the bridge have been constructed with a lower end and a higher end to continue the constant grade) Or a bridge is always 0% grade (same height at both end)?
Thanks for your help !
Rail4Pete
P.S. Hope my question is understandable...english is not my
Thanks for your help !
Rail4Pete
P.S. Hope my question is understandable...english is not my
Last edited: