Is possible to cover the trough left from digging a hole to adjust a bridge so as the invisible rail and ship do not fall in? or can the bridge height be adjusted through the config file? thank you.
If the invisible track in the water is part of the bridge mesh it can only be height adjusted by raising or lowering the bridge. If its seperate from the bridge mesh it should be adjusted like any other section of track.