BNSF Sub project

nikitka1988

Virtual Railroad Tycoon


Hi!

I am glad to introduce you to my current project - BNSF Cajon Subdivision. A 81.5 mile long line between Barstow and San Bernardino two main track line. Also, in the perspective I planned to build a line to Mojave(BNSF Mojave Sub) which connects West Barstow Yd and Mojave town. This project was conceived by me 2 years ago and in that time I have built BNSF trackage and UP(ex SP) Palmdale Cutoff from UP West Colton Yd to Palmdale. In my project, I tried to model railway system in the present times.

-Railroad map


-Profile


-Some info at SoCalRailFan:
http://www.socalrailfan.com/subdivisions/bnsf_cajon_sub.html
Cajon Pass.net
http://www.cajonpass.net/gallery/index.php?cat=1

-So, let's start:

Work progress:
- Trackage work - 75 % At the moment, it remains to build BNSF Barstow Yd and UP West Colton Yd and fixing grades and curves anywhere
- Scenery - 45 %
-Signaling - 95%
-Texture work - 56%
(09.12.2013)

-Screens:







I'm glad to hear your criticism and suggestions to my route...

Nikita:wave:
 
Last edited:
Absolutely jaw-dropping! The first pic in your first post I am still debating as to whether it real or Trainz! :D
 
Ah, finally. I've always been a fan of your routes, glad to see you're bringing it public and can't wait to see more.

Cheerio,
Nicholas
 
Sorry for asking, but where are those double-stack cars in the first shot available?
Your route look very realistic, btw!
 
Looks very promising. I'll make sure to keep an eye on this project, and I wish you the best of luck!

Regards,
Scott
 
This route will make my trainz complete route wise. It looks amazing and very accurate to its time frame. I can't wait to watch it progress into release!
 
Only problem I see is considering the fact that I have been to Hill 582, I know it is not that grassy there. It only is during the Spring. Other times it is as deserted as many people think.
 
Back
Top