Actually it is the assets, the canal banks. Shoves made them especially for this route but I have just discovered he omitted to send them to the DS...
Which gives us all a bit of a problem.
Can a kind soul come to my aid and create a set like these below please.
Each is a short section joined up to save space and get them all into one shot.
Don't have to be indentical, just near enough as I will have to delete the whole lot anyway and replace.
And maybe a river bank, a scruffy one with grass on it? About the same size so it will attach to the splines. Yes, they are all splines and I need them for Trainz 2004, very important is that last bit..
I am stuck without them and it will delay the route no end. Of course I had not realised this problem when I sent the first WCL up, so I expect there are a lot of blank spaces along the canals!
Many thanks for even looking through this,
Angela
Which gives us all a bit of a problem.
Can a kind soul come to my aid and create a set like these below please.

Each is a short section joined up to save space and get them all into one shot.
Don't have to be indentical, just near enough as I will have to delete the whole lot anyway and replace.
And maybe a river bank, a scruffy one with grass on it? About the same size so it will attach to the splines. Yes, they are all splines and I need them for Trainz 2004, very important is that last bit..
I am stuck without them and it will delay the route no end. Of course I had not realised this problem when I sent the first WCL up, so I expect there are a lot of blank spaces along the canals!
Many thanks for even looking through this,
Angela