I'm trying to set up a level crossing in my route. The route is intended to be as close as I can get it to the prototype - operationally if not scenically. For those that know, its between Bestwood Park Jn, Bulwell Forest Crossing and Lincoln Street Crossing, on the Mansfield line north of Nottingham. This is now the Robin Hood Line, although I'm modelling it as it was in late 70s/80s, when the line just carried coal traffic and was worked on Absolute Block.
The distances are BPJ-BFX = 440yds, BFC-LSX = 1.6 miles.
I've set up the level crossing at Bulwell Forest with the ATLS system, using an Inverse Slave to prevent the signal clearing until the crossing is clear. It works a treat, watching a train approach the crossing, seeing the crossing opening, then the signal clearing is a joy.
The problem is this.
There could be a situation when 2 trains follow each other closely.
The first would operate the crossing correctly, clear the crossing and reset the ATLS system.
The second train would then hit the trigger, activate the ATLS system and open the crossing.
BUT the 1st train would still be in the long section to LSX, so the signal will not clear.
SO there will be a situation with the 2nd train sitting at a stop signal which is On, but with the level crossing closed to road traffic, until the 1st train clears the long section.
Is there a way to delay activation of the ATLS system, after it's been triggered, until the section is clear?
The ATLS system seems to be so versatile, is it possible to have a version of the trigger with options to set it to 1) Clear and reset (default- the current behaviour) 2) Clear crossing only or 3) Reset system only.
The problem does not appear in the other direction, as any train will have cleared the short 440yd section BFX-BPJ well before any 2nd train will trigger the crossing again.
The distances are BPJ-BFX = 440yds, BFC-LSX = 1.6 miles.
I've set up the level crossing at Bulwell Forest with the ATLS system, using an Inverse Slave to prevent the signal clearing until the crossing is clear. It works a treat, watching a train approach the crossing, seeing the crossing opening, then the signal clearing is a joy.
The problem is this.
There could be a situation when 2 trains follow each other closely.
The first would operate the crossing correctly, clear the crossing and reset the ATLS system.
The second train would then hit the trigger, activate the ATLS system and open the crossing.
BUT the 1st train would still be in the long section to LSX, so the signal will not clear.
SO there will be a situation with the 2nd train sitting at a stop signal which is On, but with the level crossing closed to road traffic, until the 1st train clears the long section.
Is there a way to delay activation of the ATLS system, after it's been triggered, until the section is clear?
The ATLS system seems to be so versatile, is it possible to have a version of the trigger with options to set it to 1) Clear and reset (default- the current behaviour) 2) Clear crossing only or 3) Reset system only.
The problem does not appear in the other direction, as any train will have cleared the short 440yd section BFX-BPJ well before any 2nd train will trigger the crossing again.