Are there any ( really ) long routes for TS2010 / TS2012 ?

Ditto. Sorry, I know nearly all the folks who applied the patch are good and decent Trainzers, but unless we put up a fight, then things will only get worse.
 
Thank you .

Can you please check this thread ?

http://forums.auran.com/trainz/showthread.php?82610-Dragons-Pass-V4-0&p=1178279#post1178279

I have some problem with it .

I have A list of kulds on my site Here V5.0 will only have profig Trees other then that everything will be on DLS I'm doing this because I'm tired of using stuff form 3ps and losing the links or they close out. V4.5 is on DLS I'm thinking about releasing V5.0 as V4.6 as a update to remove the extras.
 
I can't imagine too many routes bigger than the newest UMR route. UMR2014-summer on the DLS is huge. I have sessions on www.trainzsessions.com. It works on the latest service packs. and has lots of scenery. New session launched tonight.

David
 
Last edited:
Lol, thank you for recognizing that we don't have to tolerate whatever you and your ilk would like forced on us. :)


Nah, I'm not trying to force anything on anybody. To each his own. I'm not into proselytizing, I'll leave that to you. Happy Trainzing.:wave:

*I don't think I've heard someone use the word "ilk" since I was in the 8th grade, back in...1974.
 
Nah, I'm not trying to force anything on anybody. To each his own. I'm not into proselytizing, I'll leave that to you. Happy Trainzing.:wave:

*I don't think I've heard someone use the word "ilk" since I was in the 8th grade, back in...1974.

If you had gone further, you'd be a bit more familiar with the term. In any case, feel free to learn how to create content yourself. Happy Trainzing to yourself as well. :)
 
I just would like to drive a train and enjoy the scenery .

The Canadian Pacific Railway’s Mountain Subdivision: Field to Revelstoke British Columbia, Canada was designed for enjoying the scenery.

It is 150 miles long and takes about five and a half hours to run one way end to end. It features the Spiral Tunnels in the Kicking Horse Pass, the Connaught and Macdonald Tunnels in Rogers Pass and the coal staging yard at Golden, BC. There are three versions, an early fall version for Trainz 2010, and an early fall version for TS12 and a winter version for TS12. The TS12 versions are the most scenic as they use JVC vegetation (payware). The TS12 versions are in three sections.

A good look at the route may be had at my website. The website also contains links to the files to download.

http://www.doug56.net/MBC/

Cayden
 
Back
Top