The EMD E series units had two diesel engines. Here's the question: Could the engineer operate the two diesel engines separately, or did they operate only together? For example, while in a depot, could one engine be throttled down to idle while the other ran at a higher RPM to generate power for the passenger wagons?
Cheers
AJ
Cheers
AJ