I've tried to test is myself, but didn't get to finite conclusion. How do built-in JR signals handle signalisation on single-track sections?
For example, the station A with multiple tracks merges into a single-track with starter (JR 04). Than every 2 kilometers (block length) there are 2 JR 05...
You might be right for some countries. But in Europe you will only find non-wlded tracks on some old branch lines and they use some ancient signaling system or no signaling at all.
If the track is welded, nothing else than AF works.
Alstom's solution is quit often used in Europe. There's also...
Real life track curcuit uses either voltage or audio frequencies. If it's voltage, you can't overlap them as circuit is either opened (electricty flows) or closed (electricty doesn't flow).
If it's AF, it can use multiple frequencies and each one represents different circuit, but you still...
I successfully use 243 timetables uisng Stops and TimeTables manager and it worked flawlessly untill I tried to add 40 more. Since than I had to revert to backup of my route and session. I added these 40 timetables again and now it's fine. 283 timetables.
Once again I'm experinecing problems with Mission Code Stops and TimeTable Manager from pguy.
When I try to open this session rule, I get an error: PropertyNrowserRefresh() not handled. A script error occurred while attempting to edit the properties of this asset.
This happend to me while trying...
The scenario you describe is industrial siding and usually it's dead end. I haven't seen many real life places where they have an exit on the other side. Usually, the locomotive would back into the siding and then move on, while the wagons stay. When you have to go, you just couple the loco and...
Thank you very much.
Great idea. I work on a quit long branch (~ 100 km) and I need to split it because otherwise the capacity would be too low. So I will be adding stations every 20 or so kilometers. I'll try it using one tower per section between two stations and TCBs for every platform (2...
I already did and it worked with 2 trains, but once I added 3rd and after some time I got deadlock situation.
I used TCBs for every platform (2 tracks per station) and for every single track section between. EITs were set as described in first post.
I encountered an interesting situation.
I have 3 stations connected with single track and every station has a passing loop. The distanced between them are different and I can't rely on scheduled time.
Station A Station B Station C...
Hello.
I tried to use Mission Code Stops and TimeTables Manager today and I couldn't get it to work.
Firstly I created MissionCodes for trains running to and from stations. And I can drive the train myself while beeing guided by the MissionCode without any problems.
Then I wanted to make Ai...