acelejalde
Urban Transit Developers
I'm unable to get into NYCTF at this time, so for *my* routes and projects, all updates will be here or in the "NYC subway route" thread.
Just wanted to let everyone know that I'm signalling the entire 5 line today and tomorrow and hopefully will have a beta to be released by Monday at the earliest. I figured that the Brooklyn extension is one of the more complex part of the routes (the rise and fall of the Flatbush Av corridor and Rogers Junction), so for now, the beta route will (physically) end at Boro Hall. Pretty much, the beta will be both Bronx branches of the (5) down to Bowling Green. You can technically drive the train to Boro Hall and switch over at the interlocking west of the station.
Anywho, the beta will not have any heavy scenery for the Bronx El portions at this time minus the el track support beams. Once the full Lex Av line comes out (all three routes), then scenery will be added. Keep your eyes peeled for a beta link!
-A :wave:
Just wanted to let everyone know that I'm signalling the entire 5 line today and tomorrow and hopefully will have a beta to be released by Monday at the earliest. I figured that the Brooklyn extension is one of the more complex part of the routes (the rise and fall of the Flatbush Av corridor and Rogers Junction), so for now, the beta route will (physically) end at Boro Hall. Pretty much, the beta will be both Bronx branches of the (5) down to Bowling Green. You can technically drive the train to Boro Hall and switch over at the interlocking west of the station.
Anywho, the beta will not have any heavy scenery for the Bronx El portions at this time minus the el track support beams. Once the full Lex Av line comes out (all three routes), then scenery will be added. Keep your eyes peeled for a beta link!
-A :wave: