Update for April/May
I got the chance to dig in over the last few days and get a fair few outstanding jobs on the map done.
A short list of what was completed:
Cronulla Branch (Original Single Line)
National Park Branch (except the tram museum at Loftus, waiting on diagrams)
Wollongong Yard and wiring
All small Branch lines Between Wollongong and Kiama
Wiring Kembla Grange to Bombo
Dapto station started
Level Crossings installed and working between Wollongong and Berry
Trackwork fixes and additions where needed
Signalling upgrades on Mountain Line to Moss Vale
The map is now back with Grazlash so he can continue his magic. Ill focus on getting some shots up for you guys soon.
Two shots showing the recently completed trackwork at Cronulla.