SAUBER_KH7
Bullet Stream Liner
So to make a long story short: I started creating a new route a few months ago, before I got my new and current PC. I had originally started creating my route in 10m baseboards to cut down on loading times. A lesson learned from my old route, which was all 5m baseboards and took a long time to load. Well now that I have a new PC with an SSD large enough to have Trainz and other large games installed, I discovered that even my old route loaded nice and fast.
Thus, I decided I wanted to convert the baseboards on my current route project from 10m to 5m. Problem is, my route is still rather large, with hundreds of baseboards. So the question is, is there a way to convert all baseboards to 5m at once, or at the very least, several baseboards at once?
Thus, I decided I wanted to convert the baseboards on my current route project from 10m to 5m. Problem is, my route is still rather large, with hundreds of baseboards. So the question is, is there a way to convert all baseboards to 5m at once, or at the very least, several baseboards at once?