Hi there,
Don't know whether my copy of this route was corrupted in download, but there seem to be a number of problems I found with this layout.
1. The standard gauge siding to the coaling trestle has no point lever. Also nothing on this siding seems to be able to load (Not attached to trestle ?). Gives error when told to drive there. (Not found - Ourtrack0)
2. PL Lumberyard 1 - this seems to be an isolated section of standard gauge track sitting between 2 NG tracks
3. PL Lumberyard 4 & PL Lumberyard 5 - Isolated tracks at the bottom of the Logdump pond ?????
4. Coal Loading Dummy 1 - An isolated piece of track on the riverbank.
5. Locust Summit Coalbreaker - the LARS tracks work but clicking on the thing itself causes errors.
6. Something strange with trackend at SSMultiLOG Deck 1 - AI keeps driving off end of track despite the cross trackend I see there.
Nothing too serious, and it's a great layout. Congratulations. Just thought I'd point these out.
Regards
Dave Bird
Don't know whether my copy of this route was corrupted in download, but there seem to be a number of problems I found with this layout.
1. The standard gauge siding to the coaling trestle has no point lever. Also nothing on this siding seems to be able to load (Not attached to trestle ?). Gives error when told to drive there. (Not found - Ourtrack0)
2. PL Lumberyard 1 - this seems to be an isolated section of standard gauge track sitting between 2 NG tracks
3. PL Lumberyard 4 & PL Lumberyard 5 - Isolated tracks at the bottom of the Logdump pond ?????
4. Coal Loading Dummy 1 - An isolated piece of track on the riverbank.
5. Locust Summit Coalbreaker - the LARS tracks work but clicking on the thing itself causes errors.
6. Something strange with trackend at SSMultiLOG Deck 1 - AI keeps driving off end of track despite the cross trackend I see there.
Nothing too serious, and it's a great layout. Congratulations. Just thought I'd point these out.
Regards
Dave Bird