I'm building the New Mexico Rail Runner route.
I received an Employee Timetable PDF from them and it lists 17 control points along the 90+mile route.
I know I can't have signals along a single section of track (corn field meetings).
But looking at Google Maps/Earth some of the CPs are in the middle of single track sections and others at sidings.
So my questions...
How does the railway use these?
Do I need to remove the single track ones and keep the ones at the sidings?
How would I go about using them in TRS19?
Thank you for your time,
Joe
I received an Employee Timetable PDF from them and it lists 17 control points along the 90+mile route.
I know I can't have signals along a single section of track (corn field meetings).
But looking at Google Maps/Earth some of the CPs are in the middle of single track sections and others at sidings.
So my questions...
How does the railway use these?
Do I need to remove the single track ones and keep the ones at the sidings?
How would I go about using them in TRS19?
Thank you for your time,
Joe