skyedog2012
New member
Hi
I wish to know if there is a way to copy orders from 1 Schedule Library to another Schedule Library. I had to add another instance of the file in the session that I am running because I tried to add more orders, it would allow me to add them but would not save them. So I think I have reached the limit of how many orders I can have. I tried to open both files in surveyor but it would only allow one to be opened at the same time.
Is there a way to copy orders out of surveyor say using a text editor?
The session I am running has 44 AI steam locos and each one needs a refueling order only because of the re-coupling of the lead truck.
I wish to know if there is a way to copy orders from 1 Schedule Library to another Schedule Library. I had to add another instance of the file in the session that I am running because I tried to add more orders, it would allow me to add them but would not save them. So I think I have reached the limit of how many orders I can have. I tried to open both files in surveyor but it would only allow one to be opened at the same time.
Is there a way to copy orders out of surveyor say using a text editor?
The session I am running has 44 AI steam locos and each one needs a refueling order only because of the re-coupling of the lead truck.