Heinrich505
Active member
I'm running the helper in cab mode on the EB freight to Drexel in the snow, TANE SP2.
The route is amazing. I am floored by the scenery and the route.
Problem is, I can't seem to get more than 15 mph on this incredibly long freight, and as I get to the two tunnels, possibly on the summit (3.50% or better), wheel spin kills me and I end up spinning wheels to a stop. I've been using copious amounts of sand to get wheel purchase but I'm getting stalled out just as I come out of the 2nd tunnel at a signal and a siding line.
Once I'm stalled out, even gently adding notches doesn't help. I start sliding backwards and have to brake again...or worse, can't stop the slide. Incredibly long train.
Any help or suggestions would be greatly appreciated.
Heinrich505
The route is amazing. I am floored by the scenery and the route.
Problem is, I can't seem to get more than 15 mph on this incredibly long freight, and as I get to the two tunnels, possibly on the summit (3.50% or better), wheel spin kills me and I end up spinning wheels to a stop. I've been using copious amounts of sand to get wheel purchase but I'm getting stalled out just as I come out of the 2nd tunnel at a signal and a siding line.
Once I'm stalled out, even gently adding notches doesn't help. I start sliding backwards and have to brake again...or worse, can't stop the slide. Incredibly long train.
Any help or suggestions would be greatly appreciated.
Heinrich505