I'm currently working on a RF&P route and my track laying has finally reached the Acca Yard in Richmond. It's fairly large with the main yard, fuel racks and repair shops. I can't decide if I should lay out the prototypical track plan, which would look empty as even high end PC's would have trouble with the prototypical amount of trains running about, or a condensed version that models the main operations of the facilities at the expense of lost switching tracks and prototypical accuracy. I'm leaning towards the condensed version as I would rather personally have a smaller, but easier to fill, yard instead of a vast plain of empty tracks. I'm curious to see what some of you more experienced route builders out there typically do for yards.