I have a route already on the DLS, which was constructed in TRS2006 and is intended to be the first part of a series covering my area.
Although I purchased TS09 and TS10, as the computer was not really up to running them I had intended to continue using TRS06.
The decision to discontinue support for 06, and stop uploads, together with the pruchase of a new computer has made me upgrade.
The question is
Should I release my route upgrade in TS09, to allow the most widespread use of it?
or
Should I release in TS10 to use the features?
or even
Should I use TS12, even with the known merging problems?
Whats the general thoughts on this?
Thanks
Although I purchased TS09 and TS10, as the computer was not really up to running them I had intended to continue using TRS06.
The decision to discontinue support for 06, and stop uploads, together with the pruchase of a new computer has made me upgrade.
The question is
Should I release my route upgrade in TS09, to allow the most widespread use of it?
or
Should I release in TS10 to use the features?
or even
Should I use TS12, even with the known merging problems?
Whats the general thoughts on this?
Thanks