cascaderailroad
New member
What are your priorities in Trainz ?
List them here:
1) Get the entire 200 mile long trackage, and curves installed, from Harrisburg/Enola Pa to Conway Pa (requiring many, many, hours of work, jamming up Trainz, making Trainz come to an absolute crawl)
2) Get the smaller 100 mile long trackage from Mount Union Pa to Johnstown Pa installed (almost completely done)
3) Get the Altoona Yards trackage installed (something that will never be filled up, as it will make Trainz come to an absolute crawl)
4) Download all 4038 RGCX railcars, and make a 41 mile long train (jamming up my Local folder, making Trainz come to an absolute crawl)
5) Continue losing weight, modifying my high vegetarian diet, and get my diabetes under control (or none of these will get done)
6) Get a $2000, 1.21 GigaWattz, 1080 video card, gaming desktop PC built
List them here:
1) Get the entire 200 mile long trackage, and curves installed, from Harrisburg/Enola Pa to Conway Pa (requiring many, many, hours of work, jamming up Trainz, making Trainz come to an absolute crawl)
2) Get the smaller 100 mile long trackage from Mount Union Pa to Johnstown Pa installed (almost completely done)
3) Get the Altoona Yards trackage installed (something that will never be filled up, as it will make Trainz come to an absolute crawl)
4) Download all 4038 RGCX railcars, and make a 41 mile long train (jamming up my Local folder, making Trainz come to an absolute crawl)
5) Continue losing weight, modifying my high vegetarian diet, and get my diabetes under control (or none of these will get done)
6) Get a $2000, 1.21 GigaWattz, 1080 video card, gaming desktop PC built
Last edited: