Hello everyone! I have some excellent news. I have started building my first long term project. This route will be huge! It will include the following:
Red Line (Shady Grove to Glenmont)
Orange Line (Vienna to New Carrollton)
Yellow Line (Huntington to Fort Totten. Rush hour service from Franconia–Springfield to Greenbelt)
Green Line (Branch Ave to Greenbelt)
Blue Line (Franconia-Springfield to Largo Town Center)
All stations will be from original ideas even though they will be in the same place. Also, there doesn't need to be a ton of scenery too.
I will need a ton of support and help when making this route. I will update as I build each line.
Currently, Branch Ave station on the Green Line is complete. I still need to lay down the track.
Here is the first screenshot of the route:
And here is the route of the system. I'll be using Google Maps as a reference.
I will need a ton of support and motivation to complete this project. Currently, I have started working on the Green Line from Branch Ave. Already, the station is completed and the yard is almost finished. If there is anyone who would love to work on one of the lines, please send me a PM. After I finish the Green Line, the Red Line will be built next, followed by the Yellow Line. Next will be the Orange Line and finally the Blue Line. If you have any questions, please comment below or send me a PM.
Every station needs to be passenger enabled. I prefer for a train to load passengers instead of opening the doors and seeing an empty platform.
Thank you and stay awesome!
P.S. Version 5 of the EBTA is expected to be completed by December 2016.
Red Line (Shady Grove to Glenmont)
Orange Line (Vienna to New Carrollton)
Yellow Line (Huntington to Fort Totten. Rush hour service from Franconia–Springfield to Greenbelt)
Green Line (Branch Ave to Greenbelt)
Blue Line (Franconia-Springfield to Largo Town Center)
All stations will be from original ideas even though they will be in the same place. Also, there doesn't need to be a ton of scenery too.
I will need a ton of support and help when making this route. I will update as I build each line.
Currently, Branch Ave station on the Green Line is complete. I still need to lay down the track.
Here is the first screenshot of the route:

And here is the route of the system. I'll be using Google Maps as a reference.
I will need a ton of support and motivation to complete this project. Currently, I have started working on the Green Line from Branch Ave. Already, the station is completed and the yard is almost finished. If there is anyone who would love to work on one of the lines, please send me a PM. After I finish the Green Line, the Red Line will be built next, followed by the Yellow Line. Next will be the Orange Line and finally the Blue Line. If you have any questions, please comment below or send me a PM.
Every station needs to be passenger enabled. I prefer for a train to load passengers instead of opening the doors and seeing an empty platform.
Thank you and stay awesome!
P.S. Version 5 of the EBTA is expected to be completed by December 2016.