Using TLR with Industry Link (a tip for making it work)

One thing I would suggest is to Split the Aviation Fuel and Diesel Fuel into their own queues as I have found it "appears" to work better that way.
Have you monitored the logs AND the industry itself to make sure it is trying to process something.

When you view the industry in a session, you should be able to see the individual cars being processed in the "Script Properties" and the log (Client Log) should show each car as it is loaded.
MI2-Logs.png
 
Last edited:
When running a session, you can see the script properties if you "Control and Right Click" on the industry and select View Details. Scroll down to see the Script Properties as shown on the right of the image I posted in the previous post.
To see the "Client Logs" you have to have the Enable Advanced Debug Tools option checked.
To do this, from the Launch Window, click Trainz Settings, click the Dev Tab and you will find the option there.
When you have this option checked, there will be a Developer window menu item available. Select the Show Client Logs item in this menu.
Trainz-Dev-Menu.png
 
I deleted Crude in and Fuel out.
replaced them and put in the basic details as per your 1st post...minus the process that you have running in your drop off industry.

And the only way that it will transfer Commodities, is if i open the details window of Crude Oil IN and click on enable editing and then move the Crude Oil bar to the right to achieve 100%. Even thou the Script Properties say that it is processing the tankers.
So far have done that twice and am waiting for the Fuel OUT to become 100% full and see if it then loads the empty Aviation Tankers.
 
Have had a look at the Trainz Logs and in it says that the tankers are waiting for enough space to unload.??
The unloading/loading space is 400 feet, which is twice the length of the 5 tankers.

Interface.Print> 'Crude Oil IN: Unloading 3DT BP 4'

Crude Oil IN: 3DT BP 4 is waiting for enough space to unload.
 
Back
Top