Hunter1977
New member
Can anyone tell me how to upgrade or replace track in older versions routes.
I have a few older layouts I created way back when. I am slowly improving these layouts but want to know if there is a way I can replace all the track with a newer version (example replace 4m Standard with Auran 2009 concrete) without actually having to delete & replace every spline point via Surveyor.
I have a few older layouts I created way back when. I am slowly improving these layouts but want to know if there is a way I can replace all the track with a newer version (example replace 4m Standard with Auran 2009 concrete) without actually having to delete & replace every spline point via Surveyor.