The bridge is on the DLS, made by FMA. I can't remember its exact name, I think it's something like "FMA small concrete bridge" or something along those lines. All the FMA stuff is well worth a look through
Chris......are you having the same problem as me where by applying track to the FMA embankments takes ages, or am I doing something wrong? If you know of any methods for doing it quickly I'd appreciate it
Um, as for the FMA stuff, I've never really had any problems.
I lower the ground where I need to, lay track, set any spline points to the required height, and then add the embankment. As I lay the embankment, I make sure that any spline points are in the same place as those on the track, and then set the height of the embankment splinee to 0.1 less than that of the track.
Never really thought it takes ages...I'm not sure if we both do it the same way though .
Another couple of screenies from the same set to keep the thread going along happily:
No trains at Shoreley following the departure of the NMT train...but there's still plenty to see...